Permit Fees
For any questions on permit fees, please call the Building Department at 970-328-6354.
BUILDING PERMIT FEES
Valuation is based on estimated costs for the total project's materials and labor.
For New Construction & Additions: Valuation is figured by averaged square foot costs which are updated every
February and August and are in the table below.
For Remodels, Basement Finishes, Decks, Etc: Valuation is based on a good faith estimate of materials &
labor. If you are doing the work yourself, the valuation is double the cost of materials.
|
February 2013 Square Foot Construction Costs
|
|
|
|
|
Group (2009 International Building Code)
|
VA
|
VB
|
| A-1 Assembly, theaters, with stage |
|
$162.46 |
| A-1 Assembly, theaters, without stage |
|
$144.00 |
| A-2 Assembly, nightclubs |
|
$127.83 |
| A-2 Assembly, restaurants, bars, banquet halls |
|
$126.83 |
| A-3 Assembly, churches |
|
$146.11 |
| A-3 Assembly, general, community halls, libraries, museums |
|
$113.09 |
| A-4 Assembly, arenas |
|
$143.00 |
| B Business |
|
$118.20 |
| E Educational |
|
$128.42 |
| F-1 Factory and industrial, moderate hazard |
|
$62.58 |
| F-2 Factory and industrial, low hazard |
|
$61.58 |
| H-1 High Hazard, explosives |
$61.27 |
NP |
| H234 High Hazard |
|
$56.12 |
| H-5 HPM |
|
$118.20 |
| I-1 Institutional, supervised environment |
|
$123.05 |
| I-2 Institutional, hospitals |
$245.87 |
NP |
| I-2 Institutional, nursing homes |
$154.67 |
NP |
| I-3 Institutional, restrained |
|
$142.18 |
| I-4 Institutional, day care facilities |
|
$123.05 |
| M Mercantile |
|
$85.12 |
| R-1 Residential, hotels |
|
$124.61 |
| R-2 Residential, multiple family |
|
$97.29 |
| R-3 Residential, one- and two-family |
|
$107.08 |
| R-4 Residential, care/assisted living facilities |
|
$123.05 |
| S-1 Storage, moderate hazard |
|
$55.12 |
| S-2 Storage, low hazard |
|
$54.12 |
| U Utility, miscellaneous |
|
$40.62 |
|
|
|
| Private Garages use: Utility, miscellaneous |
|
|
| Unfinished Basements=$15.00 per square foot |
|
|
| For shell only buildings, deduct 20% |
|
|
| NP= Not Permitted |
|
|
| Total Valuation |
Fee |
| $1.00 to $500.00 |
$26.00 |
| $501.00 to $2,000.00 |
$26.00 for the first $500.00 plus $3.40 for each additional $100.00, or fraction thereof, to and including $2,000.00 |
| $2,001.00 to $25,000.00 |
$76.25 for the first $2,000.00 plus $15.50 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 |
| $25,001.00 to $50,000.00 |
$435.00 for the first $25,000.00 plus $11.15 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 |
| $50,001.00 to $100,000.00 |
$710.00 for the first $50,000.00 plus $7.75 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 |
| $100,001.00 to $500,000.00 |
$1,095.00 for the first $100,000.00 plus $6.20 foreach additional $1,000.00, or fraction thereof, to and including $500,000.00 |
| $500,001.00 to $1,000,000.00 |
$3,560.00 for the first $500,000.00 plus $5.25 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 |
| $1,000,001.00 and up |
$6,170.00 for the first $1,000,000.00 plus $4.05 for each additional $1,000.00, or fraction thereof. |
Other Building Permit and Inspection Fees
|
1. Plan Check Fees - Residential and Commercial
|
65% of the amount of
the Building Permit Fee |
|
2. Repetative Plan Check Fee - More than one (1) building to be constructed
from a set of plans previously approved by the Town of Eagle, minimum of 3
hour Plan Review
|
$55.00 per hour,
$165.00 minimum
|
|
3. Inspections outside of normal business hours (minimum charge – two hours)
|
$70.50/hour (See *1)
|
|
4. Re-Inpection Fees
1st Re-inspection
2nd or Subsequent Re-inspection
|
$55.00
$110.00 |
|
5. Inspections for which no fee is specifically indicated
|
$55.00
|
|
6. For issuing a permit or permit transfer
|
$25.00
|
|
7. Additional plan review required by changes, additions, or revisions of plans
(Minimum charge of one hour)
|
$55.00/hour
|
|
8. For use of an outside consultant for plan checking and inspection, or both
|
Actual Costs (See*2)
|
|
9. For Factory Built, Manufactured Housing/Mobile Homes Base Fee Cost
|
|
|
Single Wide Unit in Mobile Home Park on Pads:
2 Field inspections and 1 hour plan check/office time
|
$165.00
|
|
Double Wide Unit in Mobile Home Park on Pads:
3 Field inspections and 2 hour plan check/office time
|
$275.00
|
|
State required certification tag:
|
$45.00
|
|
Note: The above includes Plumbing and Mechanical inspections without
separate permitting.
|
|
|
Note: All additional inspections will be $55.00 each.
Examples: Footing, Foundation (other than block/pads), re-inspection and any
and all inspections performed on a basement.
|
|
|
Factory Built IRC and Manufactured IRC on foundation
|
|
|
Per double unit:
3 Field inspections and 3 hour plan review fee (basement/garage extra)
|
$476.00
|
|
Per triple unit:
5 Field inspections and 3 hour plan review fee (basement/garage extra)
|
$714.00
|
|
State required certification tag:
|
$45.00
|
|
10. Requests for specialized reports (½ hour minimum)
|
$55.00 per hour,
$27.50 minimum |
|
11. Replacement Building Inspection Card if it becomes lost or unreadable
|
$25.00
|
|
12. Fire Sprinkler Systems and Fire Alarm Systems: Permit fees shall be based
on the valuation of the system’s equipment and installation, plus an additional
65% fee will be assessed for plan review.
|
|
|
13. Replacement of roof for single-family structure only
|
$55.00
|
|
14. Grading permit fees and plan review fees:
|
|
|
Plan Review (2 hour minimum):
|
$55.00 per hour,
$110.00 minimum |
|
§ 50 cubic yards or less:
|
$50.00
|
|
§ 51 to 100 cubic yards:
|
$55.00
|
|
§ 101 to 1,000 cubic yards:
$10.50 for each additional 100 cubic yards or fraction thereof
|
$55.00 for the 1st 100
cubic yards |
|
§ 1,001 to 10,000 cubic yards:
$9.00 for each additional 1,000 cubic yards or fraction thereof
|
$149.50 for the 1st 1,000
cubic yards |
|
§ 10,001 to 100,000 cubic yards:
$40.50 for each additional 10,000 cubic yards or fraction thereof
|
$231.50 for the 1st
10,000 cubic yards |
|
§ 100,001 cubic yards or more:
$22.50 for each additional 10,000 cubic yards or fraction thereof
|
$596.00 for the 1st
100,000 cubic yards |
|
15. For moving or demolishing any building or structure:
|
$55.00 per inspection
|
|
*1 Or the total hourly cost to the jurisdiction, whichever is the greatest.
This cost shall include supervision, overhead, equipment, hourly wages,
and fringe benefits of the employees involved.
|
|
|
*2 Actual costs include administrative and overhead costs.
| |
MECHANICAL PERMIT FEES
Total Valuation shall be actual value of mechanical work.
| Total Valuation |
Fee |
| $1.00 to $2,000.00 |
$40.00 |
| $2,001.00 to $25,000.00 |
$40.00 for the first $2,000.00 plus $10.00 for each additional $1,000.00
or fraction thereof up to $25,000.00 |
| $25,001.00 or more |
$270.00 for the first $25,000.00 plus $15.00 for each additional $1,000.00
or fraction thereof |
For issuance of each permit or
a permit transfer: |
$25.00 |
Fireplaces shall require a separate permit based on the valuation of the fireplaces.
The minimum mechanical permit fee will be waived for voluntarily replacing an existing wood burner with a new technology device or a device which permanently utilizes natural gas, propane, or similar clean burning fuel. |
Other Mechanical Inspection Fees
1. Inspections outside of normal business hours (minimum charge – two Hours): $70.50/hour*
2. Re-Inspection Fees:
1st Re-inspection $55.00
2nd or Subsequent Re-inspection $110.00
3. Inspections for which no fee is specifically indicated: $55.00
4. Additional plan review required by changes, additions, or revisions of plans: $55.00/hour
(Minimum charge of one hour)
5. Replacement of existing boiler or furnace: $55.00
* Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision,
overhead, equipment, hourly wages, and fringe benefits of the employees involved.
PLUMBING PERMIT FEES
Total Valuation shall be actual value of plumbing work.
| Total Valuation |
Fee |
| $1.00 to $2,000.00 |
$40.00 |
| $2,001.00 to $25,000.00 |
$40.00 for the first $2,000.00 plus $10.00 for each additional $1,000.00
or fraction thereof up to $25,000.00 |
| $25,001.00 or more |
$270.00 for the first $25,000.00 plus $15.00 for each additional $1,000.00
or fraction thereof |
For issuance of each permit or
a permit transfer: |
$25.00 |
Other Plumbing Inspection Fees
1. Inspections outside of normal business hours (minimum charge – two Hours): $70.50/hour*
2. Re-Inspection Fees:
1st Re-inspection $55.00
2nd or Subsequent Re-inspection $110.00
3. Inspections for which no fee is specifically indicated: $55.00
4. Additional plan review required by changes, additions, or revisions of plans: $55.00/hour
(Minimum charge of one hour)
5. Replacement of existing hot water heater: $55.00
* Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision,
overhead, equipment, hourly wages, and fringe benefits of the employees involved.
|
|