Forms, Permits, Fees & Applications
- BUILDING PERMIT APPLICATIONS
- CONTRACTOR REGISTRATION New/Renewal
- INSPECTION REQUESTS
- LAND USE APPLICATIONS & CHECKLISTS
- Public Works Applications & Documents
Permit Applications are completed through Community Connect.
Please note that electrical permits and electrical inspections are now pulled through the State, along with solar permits and solar inspections.
Returning contractor/homeowner/applicant
New contractor/homeowner/applicant
If you receive a notification saying you are not authorized to create a permit application, please email permits@townofeagle.org for assistance.
Town of Eagle construction permits process & requirements:
CHAPTER 13.14 - PERMITS & FEES
Town of Eagle sign permit regulations for commercial businesses:
CHAPTER 4.16 - SIGN CODE | SIGN PERMIT APPLICATION
Building Guidelines (More to come!)
- One-and-Two Family Guidelines
- Residential Energy Code Guidelines
- Commercial Project Submittal Guidelines
- Homeowner Guides for Project Plans
- Building Permit Zoning Checklist
Forms/Worksheets
Letter Templates
- Permit EXTENSION Letter for OPEN permits
- Permit REACTIVATION Letter for EXPIRED permits
- Permit TRANSFER Letter
(Please fill out and email to permits@townofeagle.org)
Town of Eagle Community Energy Efficiency Program
In July 2021 the Eagle Town Council passed a resolution adopting a goal to achieve net-zero carbon emissions in the greater Eagle community by 2030. By partnering with Walking Mountains and the Energy Smart Colorado program, homes and businesses in Eagle can invest in rebated projects focused on improving our community and energy use in buildings. Schedule an assessment or walkthrough today!
- Solar Rebates
- Weatherization & Safety Rebates
- Electrification Rebates
Energy Code Adoption Toolkit
2025 Building and Planning FEE SCHEDULE
2021 CLIMATIC & GEOGRAPHIC TABLE
Minimum roof snow load requirements for the Town of Eagle shall be determined by using the most current edition of the Snow Load Design Data for Colorado prepared by the Structural Engineer Association of Colorado.
Eagle Ranch Fire Sprinkler Zone
How Are Fees Calculated?
First, check with our FEE SCHEDULE above.
To calculate for building permit fees, we take the highest between the estimated valuation of labor and materials OR the ICC Building Data Valuation table (updated twice a year). Please keep in mind our jurisdiction uses a multiplier of 2.
Example: Your new single-family home has livable square footage of 3100, and a garage of 1000 sq ft. The building data valuation reflects 169.09 for livable square footage and 66.20 for garage. The calculations are as follows:
169.09 x 3100 x 2= $1,048,358
66.20 x 1000 x 2= $132,400
$1,048,358 + $132,400= $1,180,758 (the estimated valuation of your new build)
Please keep in mind, fees for PIF/Sewer Tap/Water Tap are calculated through Public Works, although charged through the same system as building fees and required to be paid before permit release, updated calculations and information regarding PIF/Sewer Tap/Water Tap should be through Public Works.
Use Tax Information
The Use Tax Paid Certificate provides an exemption from municipal sales tax on construction materials for contractors. While this exemption generally applies to purchases within the Town of Eagle, it may also be recognized by vendors outside the town. However, acceptance of the certificate is at the vendor's discretion. If a vendor declines to honor the exemption, contractors may apply for a sales tax refund through the state, which collects sales tax on behalf of the Town.
Use tax is calculated based on the estimated valuation of a project. It assumes that 50% of the valuation is allocated for materials, which is then multiplied by the Town’s 4% use tax rate. For example, if a project valuation is $500,000, the estimated material cost would be $250,000. Applying the 4% use tax rate results in a $10,000 use tax obligation.
The Town does not refund use tax proceeds for sales tax paid by the contractor. If a contractor believes they were overcharged on use tax, they may submit receipts for review, as permitted by Town Code, to determine eligibility for a refund. However, contractors must provide a complete set of receipts to ensure accurate reporting.
More information, and the code, can be found HERE Version OptionsForms, Permits, Fees & ApplicationsHeadline.
To be a listed as a contractor on any Town of Eagle building permit application, you must be registered as a contractor.
Registrations need to be renewed a year from registration date.
Example Certificate of Insurance with proper coverage [HERE Version OptionsForms, Permits, Fees & ApplicationsHeadline]
If you are new to registering as a Contractor in the Town of Eagle, please review our requirements here CHAPTER 13.24. - CONTRACTORS' LICENSES.
*Mechanical Contractors are now required to upload credentials of ICC National Standard Master Mechanical Exam or equivalent. Options include: B.E.S.T. Card (Roaring Fork Valley), ICC Exam, Denver City Mechanical Exams, etc.
If RENEWING, please log into your Community Core account, find "Licenses" and click "Renew".
- Request inspections through Community Connect Portal before 4pm to schedule an inspection for the following day. Inspections may be requested by phone, call 970-328-9626.
- If you are a registered contractor with the Town of Eagle and have a Community Connect profile, click here to schedule an inspection online.
Please send completed applications to Planning@townofeagle.org.
Pre-Application Meeting Request Form
Land Use Application
New Address or Change of Address Request Form
Mobile Vending Permit
Sign Permit Application
- Please review the Town of Eagle sign regulations prior to filling out the form: Ordinance No.10, Series 2022 Sign Code
Below are some helpful checklists to assist with your Land Use Application:
- Development Plan Checklist
- Preliminary Plan & Final Subdivision Plat Checklist
- Final Subdivision Plat Checklist
- Rezoning Checklist
- Zoning Variance Checklist
- Special Use Permit Checklist
- Wireless Communications Facility (WCF) Checklist
PIF/Water & Sewer Tap Applications
Please upload completed Water & Sewer Tap Applications to Public Works to your Community Connect building permit application during Town of Eagle permitting process. For out of Town PIFs, please email the Public Works department at publicworks@townofeagle.org. If you have any questions call (970) 328-6678 .
2025 Single Family in Town
2025 Single Family Out of Town
2025 Single Family Frost Creek
2025 Multi Family, Hotels & Transient Units
2025 Commercial Out of Town
2025 In-Town Commercial, Industrial & Institutional
Backflow Reporting
BSI Online-Tester Instructions
TCO Requirements